Huiyang Construction Basket¡¤ So that high-altitude operations stable as Taishan
Compared with the traditional scaffolding, even more of its absolute advantage
- The demand on the Quantity of equipmentThe personal required at each equipmentConstruction TimeLease CostStaff costs ($760/ person / month)Total Cost
Suspended Platform£º Less operator, reduce labor costs; Short construction time, short lease time and rental cost savings
800 Sets 1 person 6 months ( save 2months ) USD4,800,000 USD4,000,000 USD8,800,000
Traditional scaffolding£º Many operators, high labor costs; The project takes a long time to increase the rental cost
800 sets 4 persons (1 person operate, 2 persons push, 1 person assist ) 8 months USD87,300 ( $14per month ) USD20,000,000 USD20,087,300
Compared with the Traditional Scaffolding, the rental of Suspended Platform can save USD 11,287,300
-
Suspended Platform£º
Reduce the demolition and set up time, fewer operators, one person can complete 4 people¡¯s workload of the traditional scaffolding, which is more efficient.
-
-
Traditional Scaffolding£º
Each device requires at least 4 people and it needs to be demolished and set up at each project. The manpower, time and efficiency are greatly increased.
-

-
Suspended Platforms£º
Driving on load, good operation stability £»good mobility £¬all angles can be smoothly operated£¬ very safe
-
-
Traditional Scaffolding£º
The distance from scaffolding to the wall is very long, no protective measures; operation layer spacing is larger and personnel job is insecure; scaffolding floor, scaffold free lap joint and butt, which have big risk of collapse
-

-
Suspended Platforms£º
Equipped with advanced operating system £¬the driving platform can be moved.
-
-
Traditional Scaffolding£º
Operation and promotion are very troublesome, operation site needs to be demolished and rebuilt to transfer.
-